BONDS WILL BE FUNDED WITH NO TAX RATE INCREASE
Proposed Projects
Prop A
Equip & Renovate School Facilities
$584,500,000
-
• HVAC
• Roofing
• Plumbing
• Electrical
• Flooring
• Fire Alarm Systems
• Pavement
• Lighting
• Kitchen Equipment
• Playground Surfaces
-
• Network Infrastructure End-of-Life Replacements
• Battery Backup Units
• VoIP Phones
• Network Cabling
• Data Center Equipment
• Wireless Infrastructure (Access Points and Switches)
• Disaster Recovery Equipment
• Network Fiber Ring for Resiliency
-
• Equipment Upgrades and Replacements
• Cameras
• Access Points
• Fire Sprinklers
• Additional Weapons Detection Systems
• Safety Operations Center/MISD Police Station
• Police Training
• Department Debriefing
• Dispatch Upgrades
• Additional Camera Monitoring
• Secured Storage
• Dedicated, Secured and Equipped Space 24/7/365
-
• Purchase Replacement Buses
• Renovations to 6th Avenue Facility and Construct Bus Shop and Bays
• Renovations to Main Street Facility
-
• Renovate Choir Rooms at Middle Schools: Howard, Wester, and Worley
• Add Orchestra Space to Middle Schools: Coble, Howard, Jones, Jobe, Wester, and Worley
-
• Additional Spaces at Ben Barber Innovation Academy for New Instructional and Certification Programs
• Classroom Conversion to High Tech Computer Labs at Ben Barber
-
• Resurface and Add Lights to HS Tennis Courts
• Resurface MS Tracks
• Build Covered Batting Cages at HS
• Install Turf at Baseball and Softball Fields (LRHS, LHS, MHS, SHS, THS)
• Middle School Practice Fields: Renovate Weight Rooms and Replace Bleachers and Scoreboards
-
• New Construction
• Ages 3-4
• Facility Designed to Provide Students With an Interactive, Engaging and Highly Visual Learning Experience
Prop B
Instructional Technology
$4,000,000
-
• Classrooms
• Will replace current end-of-life equipment as a priority at Ponder, Boren, Anderson, Harmon, and Jandrucko
• Grades PreK - 4: Will replace end-of-life equipment in 2028-2029
• Grades 5-12: Will replace current end-of-life equipment as a priority
• Norwood, Martinez and McKinzey: Will replace end-of-life equipmenx in 2028-2029
• Libraries and Common Spaces
• Will replace current end-of-life equipment as a priority
-
• Will replace current end-of-life equipment at all office/reception areas district-wide as a priority
Prop C
Stadium Renovations
$50,500,000
-
RL Anderson Stadium was built 69 years ago.
• New Bleachers
• Locker Rooms
• Press Box
• Home Concessions
• Turf Replacement
• Parking Lot Lighting
-
• Safety and Security
• Field Drainage/Turf Replacement
-
At each high school:
• Resurface Tracks
• Turf and Scoreboard Lifecycle Replacements
Prop D
Fine Arts Additions & Phase 2 of Multi-Purpose Athletic Complexes
$85,000,000
-
• Can be used as classroom, practice and rehearsal space for the following programs:
• Band
• Cheer
• Dance
• Drill Team
• JROTC
• More Functional Space to Prepare for Performances and Competitions
• Injury Prevention
• Spring Floor
• No Need to Move Large Equipment
-
• More functional space without need for volume control
• Students can receive individual and small group instruction
• Capacity to continue to grow the orchestra program
-
• Phase 1 was approved by MISD voters in 2017, and shell space has been constructed with electrical and plumbing. Designs are complete.
• Phase 2 includes:
• Locker Rooms
• Showers
• Offices
• Storage
Prop E
Phase 3 of Multi-Purpose Athletic Complexes
$53,000,000
-
-
-
• Band
• Baseball
• Cheer
• Dance
• Drill Team
• Football
• JROTC
• Soccer
• Softball
• Summer Strength & Conditioning Programs
• Track and Field
See What’s Proposed for Your Local School
Elementary Schools
-
Constructed 2018 - 54,384 SF
Safety & Security Upgrades
Technology Infrastructure Upgrades and Lifecycle Replacements
Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements
Civil Site Work Improvements
Replace Playground Surfacing
-
Constructed 2017 - 82,245 SF
Safety & Security Upgrades
Civil Site Work Improvements
Technology Infrastructure Upgrades and Lifecycle Replacements
Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements
Replace Playground Surfacing
-
Constructed 2014 - 82,455 SF
Safety & Security Upgrades
Select Flooring Replacements
Civil Site Work Improvements
Technology Infrastructure Upgrades and Lifecycle Replacements
Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements
Replace Playground Surfacing
-
Constructed 2005 - 79070 SF
Safety & Security Upgrades
Civil Site Work Improvements
Technology Infrastructure Upgrades and Lifecycle Replacements
Select Flooring Replacements
Replace HVAC Equipment
Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements
Replace Playground Surfacing
-
Constructed 1998 - 65,885 SF
Safety & Security Upgrades
Civil Site Work Improvements
Technology Infrastructure Upgrades and Lifecycle Replacements
Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements
Select Flooring Replacements
Replace Roofing
Replace Playground Surfacing
-
Constructed 2008 - 74,300 SF
Safety & Security Upgrades
Civil Site Work Improvements
Technology Infrastructure Upgrades and Lifecycle Replacements
Select Flooring Replacements
Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements
Replace HVAC Equipment
Replace Playground Surfacing
-
Constructed 2006 - 78,274 SF
Safety & Security Upgrades
Civil Site Work Improvements
Technology Infrastructure Upgrades and Lifecycle Replacements
Select Flooring Replacements
Replace HVAC Equipment
Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements
Replace Playground Surfacing
-
Constructed 2001 - 72,256 SF
Safety & Security Upgrades
Civil Site Work Improvements
Technology Infrastructure Upgrades and Lifecycle Replacements
Select Flooring Replacements
Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements
Replace HVAC Equipment
Replace Roofing
Replace Playground Surfacing
-
Constructed 2001 - 72,256 SF
Safety & Security Upgrades
Civil Site Work Improvements
Technology Infrastructure Upgrades and Lifecycle Replacements
Select Flooring Replacements
Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements
Replace HVAC Equipment
Replace Roofing
Replace Playground Surfacing
-
Constructed 2016 - 84,455 SF
Safety & Security Upgrades
Civil Site Work Improvements
Technology Infrastructure Upgrades and Lifecycle Replacements
Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements
Select Flooring Replacements
Replace HVAC Equipment
-
Constructed 2016 - 84,455 SF
Safety & Security Upgrades
Civil Site work improvements
Technology Infrastructure Upgrades and Life-Cycle Replacements
Mechanical, Electrical, and Plumbing (MEP) Life Cycle Replacements
Select Flooring Replacements
Replace HVAC Equipment
Replace Playground Surfacing
-
Constructed 2003 - 77,038 SF
Safety & Security Upgrades
Civil Site Work Improvements
Technology Infrastructure Upgrades and Lifecycle Replacements
Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements
Select Flooring Replacements
Replace HVAC Equipment
Replace Roofing
Replace Playground Surfacing
-
Constructed 2013 - 83,834 SF
Safety & Security Upgrades
Civil Site Work Improvements
Technology Infrastructure Upgrades and Lifecycle Replacements
Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements
Select Flooring Replacements
Replace Playground Surfacing
-
Constructed 1998 - 65,885 SF
Safety & Security Upgrades
Civil Site Work Improvements
Technology Infrastructure Upgrades and Lifecycle Replacements
Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements
Replace Roofing
Upgrade Interior Lighting
Replace Playground Surfacing
-
Constructed 2003 - 84,631 SF
Safety & Security Upgrades
Civil Site Work Improvements
Concrete and Sealant Repairs
Technology Infrastructure Upgrades and Lifecycle Replacements
Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements
Select Flooring Replacements
Replace Serving Lines
Replace HVAC Equipment
Replace Roofing
Replace Playground Surfacing
-
Constructed 2011 - 80,584 SF
Safety & Security Upgrades
Civil Site Work Improvements
Technology Infrastructure Upgrades and Lifecycle Replacements
Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements
Select Flooring Replacements
Replace Playground Surfacing
-
Constructed 2020 - 112,500 SF
Safety & Security Upgrades
Civil Site Work Improvements
Concrete and Sealant Repairs
Technology Infrastructure Upgrades and Lifecycle Replacements
-
Constructed 2009 - 80,584 SF
Safety & Security Upgrades
Civil Site Work Improvements
Technology Infrastructure Upgrades and Lifecycle Replacements
Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements
Select Flooring Replacements
Replace Playground Surfacing
-
Constructed 2014 - 84,455 SF
Safety & Security Upgrades
Civil Site Work Improvements
Technology Infrastructure Upgrades and Lifecycle Replacements
Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements
Replace Playground Surfacing
-
Constructed 2004 - 77,038 SF
Safety & Security Upgrades
Civil Site Work Improvements
Technology Infrastructure Upgrades and Lifecycle Replacements
Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements
Select Flooring Replacements
Replace HVAC Equipment
Replace Playground Surfacing
-
Constructed 2005 - 79,070 SF
Safety & Security Upgrades
Civil Site Work Improvements
Technology Infrastructure Upgrades and Lifecycle Replacements
Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements
Select Flooring Replacements
Replace HVAC Equipment
Replace Playground Surfacing
-
Constructed 2004 - 77,038 SF
Safety & Security Upgrades
Civil Site Work Improvements
Technology Infrastructure Upgrades and Lifecycle Replacements
Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements
Select Flooring Replacements
Replace HVAC Equipment
Replace Playground Surfacing
-
Constructed 2006 - 79,274 SF
Safety & Security Upgrades
Civil Site Work Improvements
Technology Infrastructure Upgrades and Lifecycle Replacements
Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements
Select Flooring Replacements
Replace HVAC Equipment
Replace Serving Lines
Replace Playground Surfacing
-
Constructed 2013 - 85,171 SF
Safety & Security Upgrades
Civil Site Work Improvements
Technology Infrastructure Upgrades and Lifecycle Replacements
Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements
Select Flooring Replacements
Replace Playground Surfacing
-
Constructed 2003 - 77,038 SF
Safety & Security Upgrades
Civil Site Work Improvements
Technology Infrastructure Upgrades and Lifecycle Replacements
Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements
Select Flooring Replacements
Replace HVAC Equipment
Replace Roofing
Replace Playground Surfacing
Intermediate Schools
-
Constructed 1994 - 110,942 SF
Safety & Security Upgrades
Civil Site Work Improvements
Technology Infrastructure Upgrades and Lifecycle Replacements
Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements
Select Flooring Replacements
Replace Roofing
Replace Playground Surfacing
-
Constructed 2004 - 122,600 SF
Safety & Security Upgrades
Civil Site Work Improvements
Audio/Visual Upgrades
Technology Infrastructure Upgrades and Lifecycle Replacements
Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements
Replace HVAC Systems
Select Flooring Replacements
Replace Playground Surfacing
-
Constructed 2006 - 128,000 SF
Safety & Security Upgrades
Civil Site Work Improvements
Technology Infrastructure Upgrades and Lifecycle Replacements
Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements
Replace HVAC Systems
Select Flooring Replacements
Replace Playground Surfacing
-
Constructed 2009 - 129,873 SF
Safety & Security Upgrades
Civil Site Work Improvements
Technology Infrastructure Upgrades and Lifecycle Replacements
Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements
Replace Gym Flooring
Replace Playground Surfacing
-
Constructed 2021 - 179,000 SF
Safety & Security Upgrades
Civil Site Work Improvements
Technology Infrastructure Upgrades and Lifecycle Replacements
-
Constructed 1998 - 129,873 SF
Safety & Security Upgrades
Civil Site Work Improvements
Technology Infrastructure Upgrades and Lifecycle Replacements
Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements
Replace Furniture
Replace Playground Surfacing
-
Constructed 2001 - 116,974 SF
Safety & Security Upgrades
Civil Site Work Improvements
Technology Infrastructure Upgrades and Lifecycle Replacements
Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements
Select Flooring Replacements
Replace Furniture
Upgrade Interior Lighting
Replace Roofing
Replace Playground Surfacing
Middle Schools
-
Constructed 2006 - 164,179 SF
Safety & Security Upgrades
Install Weapons Detection System
Civil Site Work Improvements
Technology Infrastructure Upgrades and Lifecycle Replacements
Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements
Select Flooring Replacements
Replace Serving Lines - Kitchen
Replace Running Track
Replace HVAC Equipment
Construct Fine Arts Addition
-
Constructed 1994 - 130,000 SF
Safety & Security Upgrades
Civil Site Work Improvements
Install Weapons Detection System
Technology Infrastructure Upgrades and Lifecycle Replacements
Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements
Upgrade Interior Lighting
Replace Exterior Bleachers
Replace the Running Track
Construct Fine Arts Addition
-
Constructed 2009 - 168,656 SF
Safety & Security Upgrades
Civil Site Work Improvements
Technology Infrastructure Upgrades and Lifecycle Replacements
Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements
Replace Serving Lines - Kitchen
Replace Running Track
Construct Fine Arts Addition
-
Constructed 2004 - 160,000 SF
Safety & Security Upgrades
Civil Site Work Improvements
Install Weapons Detection System
Technology Infrastructure Upgrades and Lifecycle Replacements
Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements to match all others
Select Flooring Replacements
Replace Serving Lines - Kitchen
Replace Running Track
Replace HVAC Equipment
Construct Fine Arts Addition
-
Constructed 2021 - 190,000 SF
Safety & Security Upgrades
Civil Site Work Improvements
Install Weapons Detection System
Technology Infrastructure Upgrades and Lifecycle Replacements
Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements
Resurface Running Track (2028)
-
Constructed 1974; 270,066 SF
Safety & Security Upgrades
Civil Site Work Improvements
Install Weapons Detection System
Technology Infrastructure Upgrades and Lifecycle Replacements
Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements
Replace Lighting
Replace Running Track
Replace Exterior Bleachers
Replace HVAC Equipment
Construct Fine Arts Addition
-
Constructed 1986 - 144,610 SF
Safety & Security Upgrades
Civil Site Work Improvements
Install Weapons Detection System
Technology Infrastructure Upgrades and Lifecycle Replacements
Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements
Replace Running Track
Upgrade Interior Lighting
Construct Fine Arts Addition
High Schools
-
Constructed 2002 - 410,000 SF
Safety & Security Upgrades
Civil Site Work Improvements
Technology Infrastructure Upgrades and Lifecycle Replacements
Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements
Select Flooring Replacements
Replace Furniture
Replace Roofing
Replace the Running Track
Replace the Football Field Turf
Replace the Scoreboard on the Game Fields
Replace HVAC Equipment
Construct Covered Batting Cages & Bullpens
Replace Scoreboards in Gyms
Add Lighting to Tennis Courts
Construct Multi-Purpose Fine Arts Addition
Complete Phase 2 - Finish Out of the 2nd Floor of the MAC
Construct Phase 3 - Multi-Purpose 50-yard Indoor Practice Field
-
Constructed 2012 - 421,855 SF
Safety & Security Upgrades
Civil Site Work Improvements
Technology Infrastructure Upgrades and Lifecycle Replacements
Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements
Replace the Running Track
Replace the Football Field Turf
Replace the Scoreboard on the Game Fields
Construct Covered Batting Cages & Bullpens
Replace Scoreboards in Gyms
Add Lighting to Tennis Courts
Construct Multi-Purpose Fine Arts Addition
Complete Phase 2 - Finish Out of the 2nd Floor of the MAC
Construct Phase 3 - Multi-Purpose 50-yard Indoor Practice Field
Tennis Courts Resurfaced Replace Nets and Screens (Overdue)
-
Constructed 2007 - 425,000 SF
Safety & Security Upgrades
Civil Site Work Improvements
Technology Infrastructure Upgrades and Lifecycle Replacements
Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements
Select Flooring Replacements
Replace the Running Track
Replace the Football Field Turf
Replace the Scoreboard on the Game Fields
Replace HVAC Equipment
Construct Covered Batting Cages & Bullpens
Replace Scoreboards in Gyms
Add Lighting to Tennis Courts
Construct Multi-Purpose Fine Arts Addition
Complete Phase 2 - Finish Out of the 2nd Floor of the MAC
Construct Phase 3 - Multi-Purpose 50-yard Indoor Practice Field
Tennis Courts Resurfaced Replace Nets and Screens
-
Constructed 1995 - 370,000 SF
Safety & Security Upgrades
Civil Site Work Improvements
Technology Infrastructure Upgrades and Lifecycle Replacements
Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements
Select Flooring Replacements
Replace Roofing
Replace the Running Track
Replace the Football Field Turf
Replace the Scoreboard on the Game Fields
Construct Covered Batting Cages & Bullpens
Replace Scoreboards in Gyms
Add Lighting to Tennis Courts
Construct Multi-Purpose Fine Arts Addition
Complete Phase 2 - Finish Out of the 2nd Floor of the MAC
Construct Phase 3 - Multi-Purpose 50-yard Indoor Practice Field
Tennis Courts Resurfaced Replace Nets and Screens
Replace Elevator
-
Constructed 2004 - 420,000 SF
Safety & Security Upgrades
Civil Site Work Improvements
Technology Infrastructure Upgrades and Lifecycle Replacements
Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements
Select Flooring Replacements
Replace the Running Track
Replace the Football Field Turf
Replace the Scoreboard on the Game Fields
Replace HVAC Equipment
Construct Covered Batting Cages & Bullpens
Replace Scoreboards in Gyms
Add Lighting to Tennis Courts
Construct Multi-Purpose Fine Arts Addition
Complete Phase 2 - Finish Out of the 2nd Floor of the MAC
Construct Phase 3 - Multi-Purpose 50-yard Indoor Practice Field
Tennis Courts Resurfaced Replace Nets and Screens
Replace Serving Lines in Cafeteria
-
Constructed 2004 - 180,964 SF
Safety & Security Upgrades
Civil Site Work Improvements
Technology Infrastructure Upgrades and Lifecycle Replacements
Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements
Select Flooring Replacements
Replace HVAC Equipment
Replace Playground Surface and Kids Academy
Install Canopies at Entrances on Back of Building
Major Renovations:
• Construct New Spaces for CTE Classes
• Convert Some classrooms to High Tech Computer Labs
-
Constructed 1952 - 64.021 SF
Safety & Security Upgrades
Civil Site Work Improvements
Technology Infrastructure Upgrades and Lifecycle Replacements
Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements
Select Flooring Replacements
See What’s Proposed for Other MISD Facilties
Operations and Transportation
-
Constructed 1997 - 653,000 SF
Safety & Security Upgrades
Civil Site Work Improvements
Expand and Improve Drop Off Area for BBCA on Site
Technology Infrastructure Upgrades and Lifecycle Replacements
Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements
Select Flooring Replacements
Update Restrooms for ADA Compliance
-
Constructed 2004 - 29,127 SF
Safety & Security Upgrades
Civil Site Work Improvements
Technology Infrastructure Upgrades and Lifecycle Replacements
Replace Screening Wood Fence
Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements
Select Flooring Replacements
Replace HVAC Equipment
-
Constructed 2006 - 475,700 SF
Construct New Building
• Construct New Offices
• Construct New Service Bays
• Add Additional Parking for Buses and Employees
• Install New Fuel Tanks for Buses
• Make Repairs to Existing Concrete Drives and Parking
Safety & Security Upgrades
Technology Infrastructure Upgrades & Lifecycle Replacements
-
Constructed 2006 - 13,600 SF
Safety & Security Upgrades
Civil Site Work Improvements
Technology Infrastructure Upgrades and Lifecycle Replacements
Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements
Select Flooring Replacements
Replace HVAC Equipment
Replace Elevator
Replace Exterior Window Seals
Purchase New Buses
Student Program Facilities
-
Constructed 1997 - 14,212 SF
Safety & Security Upgrades
Civil Site Work Improvements
Technology Infrastructure Upgrades and Lifecycle Replacements
Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements
Select Flooring Replacements
Update Interior Lighting
Overlay Roofing
-
Constructed 2013 - 32,015 SF
Safety & Security Upgrades
Civil Site Work Improvements
Technology Infrastructure Upgrades and Lifecycle Replacements
Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements
Select Flooring Replacements
-
Constructed 1964 - 65,253 SF
Safety & Security Upgrades
Civil Site Work Improvements
Technology Infrastructure Upgrades and Lifecycle Replacements
Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements
Replace Roofing
-
Constructed 1955 - 16,683 SF
Safety & Security Upgrades
Civil Site Work Improvements
Install New Bleachers
Construct New Locker Rooms
Construct Press Box on the Home Side
New Elevator
Install Parking Lot Lighting
Repair Parking Surfaces
Replace Turf and Scoreboards
-
Constructed 2008 - 42,614 SF
Safety & Security Upgrades
Civil Site Work Improvements
Technology Infrastructure Upgrades and Lifecycle Replacements
Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements
Replace Drainage and Reinstall Turf (2028-29)
Replace Stadium Scoreboards
Replace Elevator Equipment
Student Support Services & Facilities
-
Constructed 1976 - 39,100 SF
Safety & Security Upgrades
Civil Site Work Improvements
Technology Infrastructure Upgrades and Lifecycle Replacements
Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements
Construct District Fiber Ring
New Buildings & Renovations
Renovation to Existing Building for Technology Expansion
Construct New Police Safety and Security Operations Center
• Emergency Operations Center
-
Constructed 2002 - 17,900 SF
Safety & Security Upgrades
Civil Site Work Improvements
Technology Infrastructure Upgrades and Lifecycle Replacements
Concrete and Sealant Replacement
Replace Metal Roof
Replace HVAC Equipment