BONDS WILL BE FUNDED WITH NO TAX RATE INCREASE

Proposed Projects

Prop A

Equip & Renovate School Facilities
$584,500,000

  • • HVAC

    • Roofing

    • Plumbing

    • Electrical

    • Flooring

    • Fire Alarm Systems

    • Pavement

    • Lighting

    • Kitchen Equipment

    • Playground Surfaces

  • • Network Infrastructure End-of-Life Replacements

    • Battery Backup Units

    • VoIP Phones

    • Network Cabling

    • Data Center Equipment

    • Wireless Infrastructure (Access Points and Switches)

    • Disaster Recovery Equipment

    • Network Fiber Ring for Resiliency

  • • Equipment Upgrades and Replacements

    • Cameras

    • Access Points

    • Fire Sprinklers

    • Additional Weapons Detection Systems

    • Safety Operations Center/MISD Police Station

    • Police Training

    • Department Debriefing

    • Dispatch Upgrades

    • Additional Camera Monitoring

    • Secured Storage

    • Dedicated, Secured and Equipped Space 24/7/365

  • • Purchase Replacement Buses

    • Renovations to 6th Avenue Facility and Construct Bus Shop and Bays

    • Renovations to Main Street Facility

  • • Renovate Choir Rooms at Middle Schools: Howard, Wester, and Worley

    • Add Orchestra Space to Middle Schools: Coble, Howard, Jones, Jobe, Wester, and Worley

  • • Additional Spaces at Ben Barber Innovation Academy for New Instructional and Certification Programs

    • Classroom Conversion to High Tech Computer Labs at Ben Barber

  • • Resurface and Add Lights to HS Tennis Courts

    • Resurface MS Tracks

    • Build Covered Batting Cages at HS

    • Install Turf at Baseball and Softball Fields (LRHS, LHS, MHS, SHS, THS)

    • Middle School Practice Fields: Renovate Weight Rooms and Replace Bleachers and Scoreboards

  • • New Construction

    • Ages 3-4

    • Facility Designed to Provide Students With an Interactive, Engaging and Highly Visual Learning Experience

Prop B

Instructional Technology
$4,000,000

  • • Classrooms

    • Will replace current end-of-life equipment as a priority at Ponder, Boren, Anderson, Harmon, and Jandrucko

    • Grades PreK - 4: Will replace end-of-life equipment in 2028-2029

    • Grades 5-12: Will replace current end-of-life equipment as a priority

    • Norwood, Martinez and McKinzey: Will replace end-of-life equipmenx in 2028-2029

    • Libraries and Common Spaces

    • Will replace current end-of-life equipment as a priority

  • • Will replace current end-of-life equipment at all office/reception areas district-wide as a priority

Prop C

Stadium Renovations
$50,500,000

  • RL Anderson Stadium was built 69 years ago.

    • New Bleachers

    • Locker Rooms

    • Press Box

    • Home Concessions

    • Turf Replacement

    • Parking Lot Lighting

  • • Safety and Security

    • Field Drainage/Turf Replacement

  • At each high school:

    • Resurface Tracks

    • Turf and Scoreboard Lifecycle Replacements

Prop D

Fine Arts Additions & Phase 2 of Multi-Purpose Athletic Complexes
$85,000,000

  • • Can be used as classroom, practice and rehearsal space for the following programs:

    • Band

    • Cheer

    • Dance

    • Drill Team

    • JROTC

    • More Functional Space to Prepare for Performances and Competitions

    • Injury Prevention

    • Spring Floor

    • No Need to Move Large Equipment

  • • More functional space without need for volume control

    • Students can receive individual and small group instruction

    • Capacity to continue to grow the orchestra program

  • • Phase 1 was approved by MISD voters in 2017, and shell space has been constructed with electrical and plumbing. Designs are complete.

    • Phase 2 includes:

    • Locker Rooms

    • Showers

    • Offices

    • Storage

Prop E

Phase 3 of Multi-Purpose Athletic Complexes
$53,000,000

  • • Band

    • Baseball

    • Cheer

    • Dance

    • Drill Team

    • Football

    • JROTC

    • Soccer

    • Softball

    • Summer Strength & Conditioning Programs

    • Track and Field

See What’s Proposed for Your Local School

Elementary Schools

  • Constructed 2018 - 54,384 SF

    Safety & Security Upgrades

    Technology Infrastructure Upgrades and Lifecycle Replacements

    Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements

    Civil Site Work Improvements

    Replace Playground Surfacing

  • Constructed 2017 - 82,245 SF

    Safety & Security Upgrades

    Civil Site Work Improvements

    Technology Infrastructure Upgrades and Lifecycle Replacements

    Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements

    Replace Playground Surfacing

  • Constructed 2014 - 82,455 SF

    Safety & Security Upgrades

    Select Flooring Replacements

    Civil Site Work Improvements

    Technology Infrastructure Upgrades and Lifecycle Replacements

    Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements

    Replace Playground Surfacing

  • Constructed 2005 - 79070 SF

    Safety & Security Upgrades

    Civil Site Work Improvements

    Technology Infrastructure Upgrades and Lifecycle Replacements

    Select Flooring Replacements

    Replace HVAC Equipment

    Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements

    Replace Playground Surfacing

  • Constructed 1998 - 65,885 SF

    Safety & Security Upgrades

    Civil Site Work Improvements

    Technology Infrastructure Upgrades and Lifecycle Replacements

    Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements

    Select Flooring Replacements

    Replace Roofing

    Replace Playground Surfacing

  • Constructed 2008 - 74,300 SF

    Safety & Security Upgrades

    Civil Site Work Improvements

    Technology Infrastructure Upgrades and Lifecycle Replacements

    Select Flooring Replacements

    Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements

    Replace HVAC Equipment

    Replace Playground Surfacing

  • Constructed 2006 - 78,274 SF

    Safety & Security Upgrades

    Civil Site Work Improvements

    Technology Infrastructure Upgrades and Lifecycle Replacements

    Select Flooring Replacements

    Replace HVAC Equipment

    Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements

    Replace Playground Surfacing

  • Constructed 2001 - 72,256 SF

    Safety & Security Upgrades

    Civil Site Work Improvements

    Technology Infrastructure Upgrades and Lifecycle Replacements

    Select Flooring Replacements

    Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements

    Replace HVAC Equipment

    Replace Roofing

    Replace Playground Surfacing

  • Constructed 2001 - 72,256 SF

    Safety & Security Upgrades

    Civil Site Work Improvements

    Technology Infrastructure Upgrades and Lifecycle Replacements

    Select Flooring Replacements

    Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements

    Replace HVAC Equipment

    Replace Roofing

    Replace Playground Surfacing

  • Constructed 2016 - 84,455 SF

    Safety & Security Upgrades

    Civil Site Work Improvements

    Technology Infrastructure Upgrades and Lifecycle Replacements

    Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements

    Select Flooring Replacements

    Replace HVAC Equipment

  • Constructed 2016 - 84,455 SF

    Safety & Security Upgrades

    Civil Site work improvements

    Technology Infrastructure Upgrades and Life-Cycle Replacements

    Mechanical, Electrical, and Plumbing (MEP) Life Cycle Replacements

    Select Flooring Replacements

    Replace HVAC Equipment

    Replace Playground Surfacing

  • Constructed 2003 - 77,038 SF

    Safety & Security Upgrades

    Civil Site Work Improvements

    Technology Infrastructure Upgrades and Lifecycle Replacements

    Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements

    Select Flooring Replacements

    Replace HVAC Equipment

    Replace Roofing

    Replace Playground Surfacing

  • Constructed 2013 - 83,834 SF

    Safety & Security Upgrades

    Civil Site Work Improvements

    Technology Infrastructure Upgrades and Lifecycle Replacements

    Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements

    Select Flooring Replacements

    Replace Playground Surfacing

  • Constructed 1998 - 65,885 SF

    Safety & Security Upgrades

    Civil Site Work Improvements

    Technology Infrastructure Upgrades and Lifecycle Replacements

    Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements

    Replace Roofing

    Upgrade Interior Lighting

    Replace Playground Surfacing

  • Constructed 2003 - 84,631 SF

    Safety & Security Upgrades

    Civil Site Work Improvements

    Concrete and Sealant Repairs

    Technology Infrastructure Upgrades and Lifecycle Replacements

    Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements

    Select Flooring Replacements

    Replace Serving Lines

    Replace HVAC Equipment

    Replace Roofing

    Replace Playground Surfacing

  • Constructed 2011 - 80,584 SF

    Safety & Security Upgrades

    Civil Site Work Improvements

    Technology Infrastructure Upgrades and Lifecycle Replacements

    Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements

    Select Flooring Replacements

    Replace Playground Surfacing

  • Constructed 2020 - 112,500 SF

    Safety & Security Upgrades

    Civil Site Work Improvements

    Concrete and Sealant Repairs

    Technology Infrastructure Upgrades and Lifecycle Replacements

  • Constructed 2009 - 80,584 SF

    Safety & Security Upgrades

    Civil Site Work Improvements

    Technology Infrastructure Upgrades and Lifecycle Replacements

    Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements

    Select Flooring Replacements

    Replace Playground Surfacing

  • Constructed 2014 - 84,455 SF

    Safety & Security Upgrades

    Civil Site Work Improvements

    Technology Infrastructure Upgrades and Lifecycle Replacements

    Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements

    Replace Playground Surfacing

  • Constructed 2004 - 77,038 SF

    Safety & Security Upgrades

    Civil Site Work Improvements

    Technology Infrastructure Upgrades and Lifecycle Replacements

    Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements

    Select Flooring Replacements

    Replace HVAC Equipment

    Replace Playground Surfacing

  • Constructed 2005 - 79,070 SF

    Safety & Security Upgrades

    Civil Site Work Improvements

    Technology Infrastructure Upgrades and Lifecycle Replacements

    Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements

    Select Flooring Replacements

    Replace HVAC Equipment

    Replace Playground Surfacing

  • Constructed 2004 - 77,038 SF

    Safety & Security Upgrades

    Civil Site Work Improvements

    Technology Infrastructure Upgrades and Lifecycle Replacements

    Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements

    Select Flooring Replacements

    Replace HVAC Equipment

    Replace Playground Surfacing

  • Constructed 2006 - 79,274 SF

    Safety & Security Upgrades

    Civil Site Work Improvements

    Technology Infrastructure Upgrades and Lifecycle Replacements

    Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements

    Select Flooring Replacements

    Replace HVAC Equipment

    Replace Serving Lines

    Replace Playground Surfacing

  • Constructed 2013 - 85,171 SF

    Safety & Security Upgrades

    Civil Site Work Improvements

    Technology Infrastructure Upgrades and Lifecycle Replacements

    Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements

    Select Flooring Replacements

    Replace Playground Surfacing

  • Constructed 2003 - 77,038 SF

    Safety & Security Upgrades

    Civil Site Work Improvements

    Technology Infrastructure Upgrades and Lifecycle Replacements

    Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements

    Select Flooring Replacements

    Replace HVAC Equipment

    Replace Roofing

    Replace Playground Surfacing

Intermediate Schools

  • Constructed 1994 - 110,942 SF

    Safety & Security Upgrades

    Civil Site Work Improvements

    Technology Infrastructure Upgrades and Lifecycle Replacements

    Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements

    Select Flooring Replacements

    Replace Roofing

    Replace Playground Surfacing

  • Constructed 2004 - 122,600 SF

    Safety & Security Upgrades

    Civil Site Work Improvements

    Audio/Visual Upgrades

    Technology Infrastructure Upgrades and Lifecycle Replacements

    Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements

    Replace HVAC Systems

    Select Flooring Replacements

    Replace Playground Surfacing

  • Constructed 2006 - 128,000 SF

    Safety & Security Upgrades

    Civil Site Work Improvements

    Technology Infrastructure Upgrades and Lifecycle Replacements

    Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements

    Replace HVAC Systems

    Select Flooring Replacements

    Replace Playground Surfacing

  • Constructed 2009 - 129,873 SF

    Safety & Security Upgrades

    Civil Site Work Improvements

    Technology Infrastructure Upgrades and Lifecycle Replacements

    Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements

    Replace Gym Flooring

    Replace Playground Surfacing

  • Constructed 2021 - 179,000 SF

    Safety & Security Upgrades

    Civil Site Work Improvements

    Technology Infrastructure Upgrades and Lifecycle Replacements

  • Constructed 1998 - 129,873 SF

    Safety & Security Upgrades

    Civil Site Work Improvements

    Technology Infrastructure Upgrades and Lifecycle Replacements

    Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements

    Replace Furniture

    Replace Playground Surfacing

  • Constructed 2001 - 116,974 SF

    Safety & Security Upgrades

    Civil Site Work Improvements

    Technology Infrastructure Upgrades and Lifecycle Replacements

    Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements

    Select Flooring Replacements

    Replace Furniture

    Upgrade Interior Lighting

    Replace Roofing

    Replace Playground Surfacing

Middle Schools

  • Constructed 2006 - 164,179 SF

    Safety & Security Upgrades

    Install Weapons Detection System

    Civil Site Work Improvements

    Technology Infrastructure Upgrades and Lifecycle Replacements

    Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements

    Select Flooring Replacements

    Replace Serving Lines - Kitchen

    Replace Running Track

    Replace HVAC Equipment

    Construct Fine Arts Addition

  • Constructed 1994 - 130,000 SF

    Safety & Security Upgrades

    Civil Site Work Improvements

    Install Weapons Detection System

    Technology Infrastructure Upgrades and Lifecycle Replacements

    Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements

    Upgrade Interior Lighting

    Replace Exterior Bleachers

    Replace the Running Track

    Construct Fine Arts Addition

  • Constructed 2009 - 168,656 SF

    Safety & Security Upgrades

    Civil Site Work Improvements

    Technology Infrastructure Upgrades and Lifecycle Replacements

    Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements

    Replace Serving Lines - Kitchen

    Replace Running Track

    Construct Fine Arts Addition

  • Constructed 2004 - 160,000 SF

    Safety & Security Upgrades

    Civil Site Work Improvements

    Install Weapons Detection System

    Technology Infrastructure Upgrades and Lifecycle Replacements

    Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements to match all others

    Select Flooring Replacements

    Replace Serving Lines - Kitchen

    Replace Running Track

    Replace HVAC Equipment

    Construct Fine Arts Addition

  • Constructed 2021 - 190,000 SF

    Safety & Security Upgrades

    Civil Site Work Improvements

    Install Weapons Detection System

    Technology Infrastructure Upgrades and Lifecycle Replacements

    Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements

    Resurface Running Track (2028)

  • Constructed 1974; 270,066 SF

    Safety & Security Upgrades

    Civil Site Work Improvements

    Install Weapons Detection System

    Technology Infrastructure Upgrades and Lifecycle Replacements

    Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements

    Replace Lighting

    Replace Running Track

    Replace Exterior Bleachers

    Replace HVAC Equipment

    Construct Fine Arts Addition

  • Constructed 1986 - 144,610 SF

    Safety & Security Upgrades

    Civil Site Work Improvements

    Install Weapons Detection System

    Technology Infrastructure Upgrades and Lifecycle Replacements

    Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements

    Replace Running Track

    Upgrade Interior Lighting

    Construct Fine Arts Addition

High Schools

  • Constructed 2002 - 410,000 SF

    Safety & Security Upgrades

    Civil Site Work Improvements

    Technology Infrastructure Upgrades and Lifecycle Replacements

    Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements

    Select Flooring Replacements

    Replace Furniture

    Replace Roofing

    Replace the Running Track

    Replace the Football Field Turf

    Replace the Scoreboard on the Game Fields

    Replace HVAC Equipment

    Construct Covered Batting Cages & Bullpens

    Replace Scoreboards in Gyms

    Add Lighting to Tennis Courts

    Construct Multi-Purpose Fine Arts Addition

    Complete Phase 2 - Finish Out of the 2nd Floor of the MAC

    Construct Phase 3 - Multi-Purpose 50-yard Indoor Practice Field

  • Constructed 2012 - 421,855 SF

    Safety & Security Upgrades

    Civil Site Work Improvements

    Technology Infrastructure Upgrades and Lifecycle Replacements

    Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements

    Replace the Running Track

    Replace the Football Field Turf

    Replace the Scoreboard on the Game Fields

    Construct Covered Batting Cages & Bullpens

    Replace Scoreboards in Gyms

    Add Lighting to Tennis Courts

    Construct Multi-Purpose Fine Arts Addition

    Complete Phase 2 - Finish Out of the 2nd Floor of the MAC

    Construct Phase 3 - Multi-Purpose 50-yard Indoor Practice Field

    Tennis Courts Resurfaced Replace Nets and Screens (Overdue)

  • Constructed 2007 - 425,000 SF

    Safety & Security Upgrades

    Civil Site Work Improvements

    Technology Infrastructure Upgrades and Lifecycle Replacements

    Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements

    Select Flooring Replacements

    Replace the Running Track

    Replace the Football Field Turf

    Replace the Scoreboard on the Game Fields

    Replace HVAC Equipment

    Construct Covered Batting Cages & Bullpens

    Replace Scoreboards in Gyms

    Add Lighting to Tennis Courts

    Construct Multi-Purpose Fine Arts Addition

    Complete Phase 2 - Finish Out of the 2nd Floor of the MAC

    Construct Phase 3 - Multi-Purpose 50-yard Indoor Practice Field

    Tennis Courts Resurfaced Replace Nets and Screens

  • Constructed 1995 - 370,000 SF

    Safety & Security Upgrades

    Civil Site Work Improvements

    Technology Infrastructure Upgrades and Lifecycle Replacements

    Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements

    Select Flooring Replacements

    Replace Roofing

    Replace the Running Track

    Replace the Football Field Turf

    Replace the Scoreboard on the Game Fields

    Construct Covered Batting Cages & Bullpens

    Replace Scoreboards in Gyms

    Add Lighting to Tennis Courts

    Construct Multi-Purpose Fine Arts Addition

    Complete Phase 2 - Finish Out of the 2nd Floor of the MAC

    Construct Phase 3 - Multi-Purpose 50-yard Indoor Practice Field

    Tennis Courts Resurfaced Replace Nets and Screens

    Replace Elevator

  • Constructed 2004 - 420,000 SF

    Safety & Security Upgrades

    Civil Site Work Improvements

    Technology Infrastructure Upgrades and Lifecycle Replacements

    Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements

    Select Flooring Replacements

    Replace the Running Track

    Replace the Football Field Turf

    Replace the Scoreboard on the Game Fields

    Replace HVAC Equipment

    Construct Covered Batting Cages & Bullpens

    Replace Scoreboards in Gyms

    Add Lighting to Tennis Courts

    Construct Multi-Purpose Fine Arts Addition

    Complete Phase 2 - Finish Out of the 2nd Floor of the MAC

    Construct Phase 3 - Multi-Purpose 50-yard Indoor Practice Field

    Tennis Courts Resurfaced Replace Nets and Screens

    Replace Serving Lines in Cafeteria

  • Constructed 2004 - 180,964 SF

    Safety & Security Upgrades

    Civil Site Work Improvements

    Technology Infrastructure Upgrades and Lifecycle Replacements

    Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements

    Select Flooring Replacements

    Replace HVAC Equipment

    Replace Playground Surface and Kids Academy

    Install Canopies at Entrances on Back of Building

    Major Renovations:

    • Construct New Spaces for CTE Classes

    • Convert Some classrooms to High Tech Computer Labs

  • Constructed 1952 - 64.021 SF

    Safety & Security Upgrades

    Civil Site Work Improvements

    Technology Infrastructure Upgrades and Lifecycle Replacements

    Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements

    Select Flooring Replacements

See What’s Proposed for Other MISD Facilties

Operations and Transportation

  • Constructed 1997 - 653,000 SF

    Safety & Security Upgrades

    Civil Site Work Improvements

    Expand and Improve Drop Off Area for BBCA on Site

    Technology Infrastructure Upgrades and Lifecycle Replacements

    Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements

    Select Flooring Replacements

    Update Restrooms for ADA Compliance

  • Constructed 2004 - 29,127 SF

    Safety & Security Upgrades

    Civil Site Work Improvements

    Technology Infrastructure Upgrades and Lifecycle Replacements

    Replace Screening Wood Fence

    Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements

    Select Flooring Replacements

    Replace HVAC Equipment

  • Constructed 2006 - 475,700 SF

    Construct New Building

    • Construct New Offices

    • Construct New Service Bays

    • Add Additional Parking for Buses and Employees

    • Install New Fuel Tanks for Buses

    • Make Repairs to Existing Concrete Drives and Parking

    Safety & Security Upgrades

    Technology Infrastructure Upgrades & Lifecycle Replacements

  • Constructed 2006 - 13,600 SF

    Safety & Security Upgrades

    Civil Site Work Improvements

    Technology Infrastructure Upgrades and Lifecycle Replacements

    Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements

    Select Flooring Replacements

    Replace HVAC Equipment

    Replace Elevator

    Replace Exterior Window Seals

    Purchase New Buses

Student Program Facilities

  • Constructed 1997 - 14,212 SF

    Safety & Security Upgrades

    Civil Site Work Improvements

    Technology Infrastructure Upgrades and Lifecycle Replacements

    Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements

    Select Flooring Replacements

    Update Interior Lighting

    Overlay Roofing

  • Constructed 2013 - 32,015 SF

    Safety & Security Upgrades

    Civil Site Work Improvements

    Technology Infrastructure Upgrades and Lifecycle Replacements

    Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements

    Select Flooring Replacements

  • Constructed 1964 - 65,253 SF

    Safety & Security Upgrades

    Civil Site Work Improvements

    Technology Infrastructure Upgrades and Lifecycle Replacements

    Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements

    Replace Roofing

  • Constructed 1955 - 16,683 SF

    Safety & Security Upgrades

    Civil Site Work Improvements

    Install New Bleachers

    Construct New Locker Rooms

    Construct Press Box on the Home Side

    New Elevator

    Install Parking Lot Lighting

    Repair Parking Surfaces

    Replace Turf and Scoreboards

  • Constructed 2008 - 42,614 SF

    Safety & Security Upgrades

    Civil Site Work Improvements

    Technology Infrastructure Upgrades and Lifecycle Replacements

    Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements

    Replace Drainage and Reinstall Turf (2028-29)

    Replace Stadium Scoreboards

    Replace Elevator Equipment

Student Support Services & Facilities

  • Constructed 1976 - 39,100 SF

    Safety & Security Upgrades

    Civil Site Work Improvements

    Technology Infrastructure Upgrades and Lifecycle Replacements

    Mechanical, Electrical, and Plumbing (MEP) Lifecycle Replacements

    Construct District Fiber Ring

    New Buildings & Renovations

    Renovation to Existing Building for Technology Expansion

    Construct New Police Safety and Security Operations Center

    • Emergency Operations Center

  • Constructed 2002 - 17,900 SF

    Safety & Security Upgrades

    Civil Site Work Improvements

    Technology Infrastructure Upgrades and Lifecycle Replacements

    Concrete and Sealant Replacement

    Replace Metal Roof

    Replace HVAC Equipment